• Construction of waste water treatment plant 17 000 ES
  • Renovation of roof umbrellas on the roof of the production plant OLIMPIAS TEKSTIL d.o.o.
  • Construction of irrigation system of the Baranja area from the lateral channel Kneževi Vinogradi -Zmajevac
  • Construction of a irrigation channel, construction of a pump station, making of a diaphragm
  • Reconstruction of existing sewage network in Kneza Trpimira street in Belišće
  • STAGE II OF SANITARY FECAL SEWAGE OF THE SATNICA ĐAKOVAČKA SETTLEMENT
  • Upgrade of sewerage network of Ilok
  • Works on drainage construction in the village of Mohovo
  • The Mohovo-Šarengrad watermain rehabilitation
  • The rehabilitation of the main water supply pipeline to Principovac Ilok water reservoir
  • CROATIAN WATERS MENAGMENT COMPANY ZAGREB, INLAND WATERS PROJECT, the village of Otok territory

Construction of waste water treatment plant 17 000 ES

Construction of waste water treatment plant 17 000 ES as part of the project Improvement of water-municipal infrastructure of aglomeration of Županja. Supervision of the construction site of the following facilities: Pre-treatment facility, biological aeration pool, pumping station, transformer facility, sludge dehidratation facility, control building, drainage collector of purified water.

Duration of work: March 2015 - August 2017

Type of work: The supervising engeener assistant for construction works

Renovation of roof umbrellas on the roof of the production plant OLIMPIAS TEKSTIL d.o.o.

Renovation of roof umbrellas on the roof of the production plant OLIMPIAS TEKSTIL d.o.o. Cadastral municipality of Osijek, k.č. no. 9985/2. Rehabilitation of umbrellas and joints with precipitation verticals on the umbrellas of the driving hall with replacements has been done.

Duration of work: October 2016 - February 2017

Type of work: Supervising engineer for construction and crafts works

Construction of irrigation system of the Baranja area from the lateral channel Kneževi Vinogradi -Zmajevac

Construction of 41 floodgates for water level regulation,construction of the culvert shutter. Survey of 12300 m of channel network. Prokop 1583 m of new channel network

Duration of work: August 2015 - December 2016

Type of work: Chief Supervisor, Supervisor for Construction Works, Coordinator II

Construction of a irrigation channel, construction of a pump station, making of a diaphragm

Construction of the irrigation channel for irrigation of Biđ - the Bosut field - road section from km 0 + 000 to km 0 + 435, Biđ Bosut pumping station

Duration of work: November 2013 - September 2016

Type of work: The supervising engeener assistant for construction works

Reconstruction of existing sewage network in Kneza Trpimira street in Belišće

Laying of gravity pipelines DN315 and DN250 of the total length of 260m, laying of 7 audit frames, 6 rainfall drains, construction of AB frames.

Duration of work: July 2013 - October 2015

Type of work: The supervising engeener assistant for construction works

STAGE II OF SANITARY FECAL SEWAGE OF THE SATNICA ĐAKOVAČKA SETTLEMENT

The construction of the stage II sanitary fecal sewage in the Satnica Đakovačka village (collectors K.2., K.3., K.5., K.6., K.7. and K.8., and precursor cells CS-4, CS-6, CS-8 and associated pressure pipelines )

Duration of work: July 2014 - December 2014

Type of work: The supervising engeener for construction works

Upgrade of sewerage network of Ilok

Upgrade of sewerage network in Ilok on multiple locations

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

Works on drainage construction in the village of Mohovo

IPARD project - Construction of sewerage network of the village of Mohovo, construction of wastewater treatment plant

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

The Mohovo-Šarengrad watermain rehabilitation

Works on rehabilitation of main water supply pipelines from the settlement of Mohovo to Šarengrad with the execution of reinforced concrete shafts, drilling under the state road, construction of nodes.

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

The rehabilitation of the main water supply pipeline to Principovac Ilok water reservoir

The rehabilitation of the main water supply pipeline to Principovac water reservoir  to the town of Ilok, DN300, construction of reinforced concrete frames, roadside repair work

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

CROATIAN WATERS MENAGMENT COMPANY ZAGREB, INLAND WATERS PROJECT, the village of Otok territory

Sewerage system Otok - Komletinci, Drainage of the southern part of Otok, Construction of the sewerage network

Gravity sewerage system, PP ribbedpipes, diameter DN 250 to DN 300, length 5.108 m, DN 400 1.218 m I DN 600 128 m, total 6.454,00 m, Facility on sewerage - Rainfall overflow

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

About the project

Construction of waste water treatment plant 17 000 ES

Construction of waste water treatment plant 17 000 ES as part of the project Improvement of water-municipal infrastructure of aglomeration of Županja. Supervision of the construction site of the following facilities: Pre-treatment facility, biological aeration pool, pumping station, transformer facility, sludge dehidratation facility, control building, drainage collector of purified water.

Duration of work: March 2015 - August 2017

Type of work: The supervising engeener assistant for construction works

Renovation of roof umbrellas on the roof of the production plant OLIMPIAS TEKSTIL d.o.o.

Renovation of roof umbrellas on the roof of the production plant OLIMPIAS TEKSTIL d.o.o. Cadastral municipality of Osijek, k.č. no. 9985/2. Rehabilitation of umbrellas and joints with precipitation verticals on the umbrellas of the driving hall with replacements has been done.

Duration of work: October 2016 - February 2017

Type of work: Supervising engineer for construction and crafts works

Construction of irrigation system of the Baranja area from the lateral channel Kneževi Vinogradi -Zmajevac

Construction of 41 floodgates for water level regulation,construction of the culvert shutter. Survey of 12300 m of channel network. Prokop 1583 m of new channel network

Duration of work: August 2015 - December 2016

Type of work: Chief Supervisor, Supervisor for Construction Works, Coordinator II

Construction of a irrigation channel, construction of a pump station, making of a diaphragm

Construction of the irrigation channel for irrigation of Biđ - the Bosut field - road section from km 0 + 000 to km 0 + 435, Biđ Bosut pumping station

Duration of work: November 2013 - September 2016

Type of work: The supervising engeener assistant for construction works

Reconstruction of existing sewage network in Kneza Trpimira street in Belišće

Laying of gravity pipelines DN315 and DN250 of the total length of 260m, laying of 7 audit frames, 6 rainfall drains, construction of AB frames.

Duration of work: July 2013 - October 2015

Type of work: The supervising engeener assistant for construction works

STAGE II OF SANITARY FECAL SEWAGE OF THE SATNICA ĐAKOVAČKA SETTLEMENT

The construction of the stage II sanitary fecal sewage in the Satnica Đakovačka village (collectors K.2., K.3., K.5., K.6., K.7. and K.8., and precursor cells CS-4, CS-6, CS-8 and associated pressure pipelines )

Duration of work: July 2014 - December 2014

Type of work: The supervising engeener for construction works

Upgrade of sewerage network of Ilok

Upgrade of sewerage network in Ilok on multiple locations

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

Works on drainage construction in the village of Mohovo

IPARD project - Construction of sewerage network of the village of Mohovo, construction of wastewater treatment plant

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

The Mohovo-Šarengrad watermain rehabilitation

Works on rehabilitation of main water supply pipelines from the settlement of Mohovo to Šarengrad with the execution of reinforced concrete shafts, drilling under the state road, construction of nodes.

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

The rehabilitation of the main water supply pipeline to Principovac Ilok water reservoir

The rehabilitation of the main water supply pipeline to Principovac water reservoir  to the town of Ilok, DN300, construction of reinforced concrete frames, roadside repair work

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works

CROATIAN WATERS MENAGMENT COMPANY ZAGREB, INLAND WATERS PROJECT, the village of Otok territory

Sewerage system Otok - Komletinci, Drainage of the southern part of Otok, Construction of the sewerage network

Gravity sewerage system, PP ribbedpipes, diameter DN 250 to DN 300, length 5.108 m, DN 400 1.218 m I DN 600 128 m, total 6.454,00 m, Facility on sewerage - Rainfall overflow

Duration of work: 2012-2014

Type of work: The supervising engeener assistant for construction works